Website Redesign Checklist (2026): 6 Phases + Free Template

A website redesign can go wrong for reasons that have nothing to do with design. The copy arrives three weeks late, five people need to approve the homepage, or the new site goes live without redirects, putting years of SEO progress at risk.
This website redesign checklist walks you through the full project in six phases, from auditing your current site to the first 30 days after launch. Each task is labeled so you know who owns it:
- [Owner]: you do it or make the decision
- [Agency]: your developer, designer, or agency handles it
- [Both]: you work on it together
You don't need to be technical to use it. You just need to know which questions to ask and when.
Website redesign checklist at a glance
A website redesign checklist breaks a redesign into clear phases so nothing important, especially SEO, gets missed. Here's the short version:
- Audit your current website: record baseline metrics and find out what's working.
- Plan the project: set goals, budget, timeline, platform, and who approves what.
- Plan SEO from day one: map new URLs and redirects while the site is being planned.
- Create content and design: write the copy first, then design around it.
- Run pre-launch QA and plan launch day: test everything and have a rollback plan.
- Monitor the first 30 days: compare results to your baseline and fix issues fast.
Before you start: redesign or refresh?
Not every website problem needs a full redesign. If your site performs well but looks dated, a visual refresh of key templates may be enough. If a few pages are underperforming, fixing those pages is faster and cheaper.
A full redesign makes sense when the problems are structural: your site is hard to update, it doesn't work well on mobile, it no longer reflects your business, or it consistently fails to turn visitors into leads. If you're still deciding, start with these signs you need a website redesign.
Phase 1: Audit your current website
Before you change anything, document what you have. This phase protects what already works and gives you a baseline to measure the new site against.
Record your baseline metrics [Both]
Pull at least 12 months of data so seasonal swings don't mislead you. Record:
- Monthly organic traffic and total traffic
- Leads, calls, form submissions, or sales
- Conversion rate for your key pages
- Top 20 landing pages by traffic
- Keyword rankings for your most important terms
Without a baseline, nobody can prove whether the redesign worked.
Find out what's working and what isn't [Both]
Numbers show you where people drop off, but not why. Combine analytics with real feedback:
- Review analytics for high-exit pages and weak conversion paths
- Check heatmaps or session recordings, if you have them
- Ask your sales or front desk team what customers ask most often
- Talk to a few customers about what they struggled to find
Inventory your pages, content, and backlinks [Agency]
List every page on the site, its traffic, and the external sites linking to it. Pages with traffic or backlinks need a clear plan in the new site, either kept or redirected. A structured content audit makes this much easier.
- Export a full list of URLs
- Note traffic and conversions for each page
- Identify pages with backlinks from other websites
Phase 2: Plan the project
The planning phase decides most of your budget, timeline, and results. Decisions made here are cheap to change. The same decisions made during development are not.
Set goals and set up conversion tracking now [Owner sets goals, Agency sets up tracking]
"A modern-looking website" isn't a goal. Tie the redesign to business outcomes you can measure, such as more qualified leads, more booked consultations, or a higher conversion rate on service pages.
- Write down 2 to 3 measurable goals
- Define what counts as a conversion (form, call, booking, purchase)
- Make sure conversion tracking works on the current site before the redesign starts
If tracking is set up now, you'll have a clean before-and-after comparison at launch.
Set your budget and timeline [Owner]
Agree on a budget range and a realistic launch window before talking to designers. Leave room for content creation, photography, and revisions, which are the items most often forgotten. For a breakdown of what affects price, see our guide to website development cost.
- Set a budget range, including content and post-launch support
- Set a target launch date with a buffer for review rounds
- Avoid launching during your busiest season
Choose your platform and write down requirements [Both]
Decide whether to stay on your current platform or move to a new one. Then list what the site needs to do: pages, features, integrations with your CRM or booking tools, and who will update it after launch. A clear list of website design requirements prevents surprises halfway through the build.
- Confirm the platform (and whether this is also a migration)
- List must-have features and integrations
- Decide who will edit the site after launch
Decide who does the work and who approves what [Owner]
Unclear approvals stall more projects than technical problems do. Name one decision-maker, agree on how many review rounds each stage gets, and set deadlines for feedback. If you're hiring outside help, these questions to ask when designing a website will help you compare options.
- Choose in-house, freelancer, or agency
- Name one final decision-maker
- Set review rounds and feedback deadlines for each stage
Phase 3: Plan SEO from day one
SEO isn't a launch task. Your new sitemap and URLs are decided during planning and design, so the SEO work has to run alongside Phases 2 to 5. Leave it until the end, and you risk losing rankings you've spent years building.
Plan the new sitemap and URL structure [Agency, Owner approves]
Keep URLs that already rank wherever possible. When a URL has to change, it should be a deliberate decision, not a side effect of the new design.
- Draft the new sitemap and navigation
- Keep existing URLs for pages that rank or have backlinks
- Document every URL that will change
Build a redirect map for every old URL [Agency]
Every URL that changes should have a 301 redirect to its most relevant replacement. Avoid redirecting unrelated pages to the homepage. If a page is permanently removed and has no suitable replacement, a 404 or 410 response may be appropriate. Google's guidance on site moves recommends mapping old URLs to new ones before launch. Use the redirect map worksheet in the free PDF, and if you're also changing platforms, follow a full website migration process.
- List every URL that will change and map it to its new URL
- Decide which removed pages should return a 404 or 410 instead
- Avoid redirect chains (A to B to C)
- Prioritize pages with traffic, rankings, or backlinks
Carry over metadata, headings, and structured data [Agency]
Page titles, meta descriptions, headings, and schema markup often get lost when content is moved into new templates.
- Transfer or improve page titles and meta descriptions
- Keep the main keyword focus of each ranking page
- Re-add structured data (schema) to the new templates
Keep the staging site out of search results [Agency]
A development site that Google indexes can compete with your live site.
- Password protect the staging site, or set it to noindex
- Remember to remove those blocks at launch
From our work: When we redesigned the websites for Gallaudet University and Stanford Law School, both projects were delivered in under two months with no loss of existing search rankings. On tight timelines, SEO planning has to start with the sitemap, not at launch.
Phase 4: Content and design
This is the phase most people picture when they think of a redesign. It goes faster and produces a better result when the content comes first.
Write the copy before the design [Owner, Agency helps]
Late copy is one of the most common reasons redesign projects slip. When designers work with placeholder text, layouts often break once the real content arrives, and pages get redesigned twice. Start writing, or hiring a copywriter, as soon as the sitemap is approved.
- Assign an owner for each page's copy
- Set deadlines for drafts and approvals
- Gather photos, team bios, testimonials, and case studies early
Decide what to keep, update, merge, or remove [Both]
Use your Phase 1 inventory to decide what happens to each page. Pages that perform well should be kept or improved, thin or outdated pages can be merged or removed, and every removed page with value gets a redirect.
- Mark each page: keep, update, merge, or remove
- Update outdated information, prices, and team details
- Add any redirects to your redirect map
Design for your brand, mobile, and accessibility [Agency]
The new design should reflect your brand and work just as well on a phone as on a desktop. Google uses the mobile version of your site for indexing, so mobile matters for SEO as much as for users. Our guide to mobile SEO covers what to check. Build accessibility in from the start using the WCAG guidelines, rather than fixing it after launch.
- Use your brand colors, fonts, and logo consistently
- Review designs on mobile before approving them
- Check color contrast, alt text, and keyboard navigation
Build a clear conversion path into every key page [Both]
Every important page should tell visitors what to do next: call, book, request a quote, or buy. If you want the redesign to pay for itself, this is where it happens. These tips on how to improve conversion rate can help you plan each page.
- Define one main action for each key page
- Keep forms short
- Make contact details easy to find on every page
Phase 5: Pre-launch QA and launch plan
Testing catches the problems your visitors would otherwise find for you. Leave at least a week for QA before your launch date.
Pre-launch QA checklist
- Back up the existing website [Agency]
- Crawl the staging site to catch broken links, missing pages, and errors [Agency]
- Forms submit and notification emails arrive [Agency]
- No broken links or missing images [Agency]
- Internal links point to final URLs, not redirects or staging URLs [Agency]
- Canonical tags point to the correct live URLs [Agency]
- Verify robots.txt and remove unintended noindex directives [Agency]
- Structured data validates without errors [Agency]
- Page speed checked against Core Web Vitals [Agency]
- Every page reviewed on mobile [Both]
- Tested in major browsers [Agency]
- Analytics and conversion events firing [Agency]
- Cookie consent banner works and doesn't block tracking incorrectly [Agency]
- All redirects tested [Agency]
- XML sitemap updated [Agency]
- Google Search Console ownership verified for the new site [Agency]
- Privacy policy, terms, and accessibility pages in place [Owner]
- Final content proofread [Owner]
Plan launch day [Agency, Owner signs off]
A calm launch is a planned one. Agree on these details a week ahead:
- Freeze content changes on the old site a few days before launch
- If the launch involves DNS changes, lower the DNS TTL 24 to 48 hours ahead so the switch takes effect faster
- Launch at a low-traffic time, and avoid Fridays so issues don't sit over the weekend
- Have a rollback plan in case something critical breaks
- Give final sign-off [Owner]
Phase 6: The first 30 days after launch
Launch day isn't the finish line. It's normal for rankings to move a little after a redesign, so the first month is about catching problems early and comparing results with your baseline.
Monitor search and conversions [Agency]
- Submit the new XML sitemap in Google Search Console
- Check for 404 errors and crawl issues daily in the first week, then weekly
- Compare traffic, rankings, and leads with your Phase 1 baseline
- Fix any missed redirects right away
Collect feedback and fix quickly [Both]
Your team and customers will spot problems that testing missed, such as a confusing menu label, a form that feels too long, or a page people can't find. Collect that feedback in one place and fix the issues that affect leads and sales first.
- Ask your team and a few customers to complete common tasks on the new site
- Keep one shared list of reported issues
- Prioritize fixes that affect forms, calls, bookings, or checkout
- Review heatmaps or recordings, if you have them, to see where visitors get stuck
Plan ongoing maintenance [Both]
A new website starts to lose value as soon as it stops being updated. Plugins and integrations go out of date, content gets old, and small technical issues build up. Agree on who looks after the site and how often before the project closes. Use this website maintenance checklist to set up a routine.
- Decide who owns updates, security, and backups after launch
- Schedule regular content reviews for key pages
- Review performance against your goals each quarter
Plan your redesign with Striped Horse
A successful redesign usually comes down to the less visible decisions. Record your baseline before you change anything, get the copy written before design starts, plan redirects while the sitemap is still on paper, and keep watching the numbers after launch. Get those right, and the new site has a real chance to bring in more leads than the one it replaces.
You don't have to manage every task on this list yourself. Striped Horse handles redesigns from strategy and design through development, SEO, and launch, so you can focus on the decisions only you can make. If you're planning a redesign, explore our website redesign services or download the free checklist to get started.